RES Wind Project Files
- RES email “Summit Lake Wind Project Followup” 12-6-17 (PDF)
- RES Presentation 11-29-17:
- “Summit Lake Project Overview” (PDF) 14 pages
- RES Presentation 11-28-17:
- RES Presentation 3-10-17:
- RES Tier 3 Study Plan Avian and Bat Survey Protocol (PDF) 10 pages
* Includes “Fixed-Point Count Avian Use Surveys, Raptor Nest Survey, Bat Acoustic Survey” - RES Study Plan Pre-Construction Tier 3 Avian and Bat Survey Protocol (PDF) 13 pages
* Includes “Fixed-Point Count Avian Use Surveys, Spring Raptor Migration Surveys, Raptor Nest Survey, Bat Activity Survey, Incidental Observations” - WindExchange Michigan – Potential Wind Capacity (PDF) 2 pages
- RES Tier 3 Study Plan Avian and Bat Survey Protocol (PDF) 10 pages
RES Wind Project in the News
- L’Anse Sentinel 8-18-17: “Wind Testing Mast Installed” (PDF)
L’Anse Sentinel 3-15-17: “RES Inc. Tests Wind at Arvon” (JPG)
L’Anse Sentinel 3-11-16: “Bizarre Proposal > Apply for 120 Wind Turbines”